SCHOOL MALOU

Client:
Sint-Lambrechts Council
In cooperation with:
Cochy
Construction period:
5 months

Description:
Built on a hill with 8.5meter height difference. The sports hall was built low, the class rooms were built on the higher level. The covered playground for the school is located on the roof of the sports hall (ground floor level for the school).

The centre offers a sports hall with retractable seating, changing areas, first aid room etc. There are seven class rooms on the higher level. Solar panels are used for electricity.

 
Search :